Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.6717638
- Product Categories
- Friendly Links
Information Name: | Changzhou supply unsaturated resin Duty Floor professional construction |
Published: | 2013-06-26 |
Validity: | 365 |
Specifications: | |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | Scope: circuit board, electroplating factories, power plants, pharmaceutical plants, paper mills, metal works, dyeing and other flooring and other minor corrosion area Features: good acid and alkali resistance, dustproof, waterproof, mildew, wear-resistant, resistant to pressure, not easy to crack the construction process: the original ground handling anti-corrosion primer layer of fiberglass cloth laying creosote creosote creosote laid fiberglass cloth layer laying fiberglass cloth surface layer of creosote preservative Technical Specifications: Parameter Item Unit unit parameter index index compressive strength MPa ≥ 130 Bending strength MPa ≥ 230 Tensile strength MPa ≥ 100 MPa ≥ 270 Water absorption toughness% ≤ 0.02% ≤ 0.2 Shrinkage resistant H2SO4, 50% H2SO4, 50% 48 days no change resistant HNO3, 15% HNO3, 15% 48 days no change resistant CH3CHOOH, 40% CH3CHOOH, 40% 48 days no change resistance NaOH, 15% NaOH, 15% 48 days no change four, the construction process to regulate the construction process to ensure that products quality, are formulated for different ground construction process is as follows: (a) a new concrete floor construction methods: 1, clean up the site and eradicate ground debris on the scene after cleaning the surface with a vacuum cleaner to suck the dust (non-rinse). 2, the use of color on the ground floor penetrant uniform brushing (adjust the amount of material under the ground). 3, floor penetrant construction eight hours after the inspection on the ground, according to the actual situation of the ground to repair (if using putty repair, need to putty dry after sanding smooth surface and use a vacuum cleaner dust). 4, on the ground to use the repaired floor hardener evenly brushing (the amount of material according to the actual situation of the ground). (Two) old construction method of a concrete floor, clean up the site and eradicate ground debris on the scene after cleaning the surface with a vacuum cleaner to suck the dust (non-rinse). 2, the use of transparent conduct on the ground floor penetrant evenly brushing (adjust the amount of material under the ground). 3, floor penetrant construction eight hours later, according to the provisions deployment using putty on the ground for processing. 4, good for scraping putty and ground using dry after grinding machine polished smooth and thoroughly clean the surface dust with a vacuum cleaner. 5, on the ground to use the repaired floor hardener evenly brushing twice (the amount of material according to the actual situation of the ground). V. Note: 1, the ground before construction must be kept dry, clean water is strictly prohibited; 2, before using this product, stir; 3, the product storage temperature should be about 5 ℃ ~ 35 ℃; 4, should be used after opening finished, sealed prohibited |
Admin>>>
You are the 18518 visitor
Copyright © GuangDong ICP No. 10089450, Coating Engineering Co., Ltd. Changzhou Vanguard All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 18518 visitor
Copyright © GuangDong ICP No. 10089450, Coating Engineering Co., Ltd. Changzhou Vanguard All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility